Contract signed through job closed and warranty support. No permit, no stamped drawings. 9 phases with full accountability mapping for all roles.
- 50% deposit · 45% major completion · 5% punchlist
- 9 phases: Handoff → Verification → Pre-Construction → Procurement → Construction → Post-Construction → Closeout → Reviews → Warranty
- Valor job stage indicators per phase
- Full accountability matrix — REP · OM · PM · AS
Additions, sunrooms, and projects requiring permits, stamped engineering, architectural drawings, and HOA approval. 12 phases with master timeline reference.
- Permit + architectural drawings + HOA required
- 3-payment: $3K deposit · 50%−$1,500 · Final balance
- 12 phases: includes architect, HOA, permit, sub bids
- Master timeline reference: 4–7 month typical range
Answers to the most common homeowner questions — before, during, and after installation. Reduces back-and-forth and sets proper expectations at every stage.
Interactive form for qualifying incoming leads and capturing project scope before appointment scheduling. Ensures the right info is collected upfront.
Three manufacturers. Multiple configurations. Product knowledge, buyer archetypes, and scripts to diagnose any porch and close the right solution.
- Porch Windows Direct · Craft-Bilt · PGT Eze-Breeze
- 4 buyer archetypes + full objection scripts
- Fall barrier solutions: railing, fixed lites, SIP panels
Real tempered glass in extruded 3" aluminum frames. Product knowledge and every item that must appear on the customer agreement.
- Real tempered glass — not vinyl-film
- Single clear tempered or 5/8" insulated argon glass
- 25-year manufacturer's limited warranty
Elastomeric vinyl-film panels in a 4-track aluminum frame — not glass. Product knowledge and agreement requirements.
- Elastomeric vinyl-film — not glass, not rigid
- 2-track (narrower bays) · 4-track (wide spans)
- 10-year Craft-Bilt manufacturer warranty
Step-by-step installation procedures for each product type. Material checklists, work orders, and crew coordination guide.
Final measurement procedures, documentation requirements, and material breakdown process from site to order.